Family-run since 2013No subcontractors — we install every job ourselves5,000+ installations across SE Queensland100+ years of combined electrical experienceSolarQuotes Gold-rated · 5.0 reviewedNETCC-approved · Licensed QLD electricians Free no-obligation quotes
White
Aerial view of the 29.9kW solar array across the roof, Eight Mile Plains

Residential case study

29.9 kW of solar and 48.36 kWh of battery storage in Eight Mile Plains

A 29.9kW solar array and 48.36kWh Sigenergy battery with automatic backup, finished in all-black racking and bird proofing for a quality-focused Brisbane homeowner.

29.925kW

Solar array

48.36kWh

Sigenergy battery storage

63panels

Jinko Solar Tiger Neo 475 W

30kW

Three-phase Sigenergy SigenStor

The brief

Project overview

Open Electrical designed and installed a large residential solar and battery system for a homeowner in Eight Mile Plains, Brisbane.

The customer wanted more than a high-capacity energy system. They were also focused on the finer details of the installation, including the correct mounting solution for their Colorbond roof, the appearance of the cable route and the long-term protection of the property.

The finished system combined almost 30kW of solar generation with 48.36kWh of battery storage, automatic backup capability and a clean all-black finish.

Open Electrical installer wiring the Sigenergy hybrid inverter during the battery installation

The customer’s priorities

The homeowner approached Open Electrical looking for a large solar and battery solution that would reduce their reliance on grid electricity and provide greater energy security during outages.

They were also particularly conscious of installation quality. Before proceeding, the customer wanted to confirm that the mounting brackets would be suitable for the home’s Colorbond roof profile. They were also interested in how the main cable route between the roof and garage would be completed, including whether the wiring could be concealed or would require external conduit.

These discussions allowed the installation team to consider the roof, cable pathways and preferred finish before arriving on site.

Drone photo of the completed 29.9kW solar installation on the Eight Mile Plains home

What needed planning before day one

Mounting on Colorbond

The customer wanted to confirm the mounting brackets suited the home’s Colorbond roof profile before work went ahead.

The cable route

The main cable run between the roof and garage had to be planned, including whether it could be concealed or needed external conduit.

Protecting the roof

All-black bird proofing around the array keeps birds and animals from nesting under the panels and protects the wiring.

The system

After assessing the property, roof space and expected energy requirements, Open Electrical designed a 29.925kW solar system supported by 48.36kWh of Sigenergy battery storage.

The solar array included 63 Jinko Solar Tiger Neo panels, positioned across multiple roof faces to make effective use of the available space.

The system was paired with a three-phase Sigenergy SigenStor inverter and battery solution. A Sigenergy Gateway was also included to provide automatic home backup during grid outages and manage the flow of electricity between the solar array, battery, home and grid.

This gave the homeowner a high-capacity system capable of generating and storing substantial amounts of energy while providing greater resilience during interruptions to the electricity network.

Electrician commissioning the wall-mounted Sigenergy battery at the switchboard, Eight Mile Plains

Panels

Jinko Solar Tiger Neo

Positioned across multiple roof faces to make effective use of the available space.

Quantity63 panels
Rated power475 W each
System size29.925 kW

Inverter and battery

Sigenergy SigenStor

Three-phase inverter and battery solution, with a Sigenergy Gateway for automatic home backup during grid outages.

Inverter30 kW three-phase
Battery storage48.36 kWh
BackupSigenergy Gateway

Installation

Careful planning and installation

The roof design required panels to be installed across several sections of the home. Before work commenced, the team considered the appropriate mounting equipment for the existing roof profile and reviewed the proposed cable pathways. This helped ensure the finished system would not only perform effectively but also maintain a clean, professional appearance.

The installation also included all-black anodised racking, including black mids, ends and clamps. These components were selected to complement the black panel frames and create a more consistent finish across the roof.

All-black bird proofing was installed around the solar array to help prevent birds and other animals from nesting beneath the panels. This provides additional protection for the wiring and roof area while helping to reduce future maintenance issues.

Close-up of the Sigenergy SigenStor battery modules after installation

The outcome

Why this project stands out

This project demonstrates how careful planning can be just as important as system capacity.

The homeowner was highly engaged throughout the design process and wanted confidence that the installation would protect the roof, maintain a clean appearance and deliver reliable backup capability.

By addressing those questions before installation, Open Electrical was able to deliver a system that combined substantial solar generation, large-scale battery storage and a high-quality finish.

Delivery

How the project ran

Property assessment

Roof space, expected energy requirements and the home’s roof profile assessed.

Planning the details

Mounting equipment and cable pathways reviewed before arriving on site.

Installation

63 panels across several roof sections on all-black anodised racking, with all-black bird proofing.

Backup and handover

Sigenergy Gateway set up for automatic home backup during grid outages.

The result

Almost 30kW of solar and more than 48kWh of storage

The completed installation provides the homeowner with almost 30kW of solar generation and more than 48kWh of usable battery storage. During the day, the solar array can power the home while charging the battery with excess generation. Stored energy can then be used later in the day or overnight, helping the household reduce its dependence on grid electricity.

29.9kW
Of solar generation across multiple roof faces
48.36kWh
Of Sigenergy battery storage
Autobackup
Switches to backup power during a grid outage, subject to configuration and battery charge

Project gallery

On site

Maximise Benefits of Solar Energy in Brisbane

Ready when you are

Thinking about a project like this one?

Talk to the team that designed and installed it. We will assess your property, model the numbers and give you a straight answer on what makes sense.

Keep exploring

More case studies

97.94 kWp of rooftop solar for ARB Caloundra
ARB Solar Installation Caloundra

97.94 kWp of rooftop solar for ARB Caloundra

Solar: 97.9kWLocation: Caloundra, Sunshine Coast

A full export commercial system across two roof planes at a busy auto parts and 4x4 accessories store on the Sunshine Coast, designed to cut the store’s reliance on grid electricity through its trading day.

Read case study
Solar and battery upgrade in Coorparoo
solar street coorparoo solar battery install

Solar and battery upgrade in Coorparoo

Solar: 8.8kWBattery: 32.2kWhLocation: Coorparoo, Brisbane

Chris upgraded his existing solar system with an additional 8.8kW of solar and 32.24kWh of Sigenergy battery storage, helping future proof his Coorparoo home for retirement, EV charging and increased energy needs while reducing electricity bills from over $300 a month to as little as $7.49.

Read case study
A staged solar and battery upgrade for a Pullenvale acreage
Drone view of installers fitting all-black Aiko panels on the Pullenvale acreage roof

A staged solar and battery upgrade for a Pullenvale acreage

Solar: 22.8kWBattery: 48.4kWhLocation: Pullenvale

A staged solar and battery upgrade across a multi-building acreage property: 48.36kWh Sigenergy storage installed first, with a 22.8kW Aiko solar array completed after a full roof replacement.

Read case study